Trusted by 12,500+ facilities worldwide. Request a Free Consultation →

Burnham Boilers: Industrial Heating You Can Count On

From high-output steam boilers to precision gas burners, we engineer thermal systems that keep your facility running at peak efficiency. ASME certified. Field-proven across 12,500+ installations.

Burnham Boilers industrial steam boiler system
12,500+
Units Installed
38
Years Experience
98.5%
Efficiency Rating
14
Countries Served

Our Product Range

Engineered boiler and burner systems for every commercial and industrial heating demand, from compact hot water units to high-capacity steam plants.

Industries We Serve

Reliable thermal solutions powering essential operations across six core sectors.

Food and Beverage Processing

Food & Beverage

Process steam for cooking, pasteurization, and CIP systems

Healthcare Facilities

Healthcare

Sterile steam for autoclaves and reliable space heating

Manufacturing

Manufacturing

High-pressure steam for presses, dryers, and process heat

Hospitality

Hospitality

Hot water and space heating for hotels, resorts, and convention centers

District Heating

District Heating

Central plant boilers for campus and municipal heating networks

Pharmaceutical

Pharmaceutical

Pure steam generation and validated temperature control

Built for a Cleaner Future

Our engineering roadmap prioritizes lower emissions, higher efficiency, and reduced environmental impact at every stage.

Low-NOx Burners

All new burner models meet or exceed EPA Tier 4 and SCAQMD Rule 1146 NOx emission limits, achieving less than 9 ppm on natural gas.

Condensing Technology

Our condensing boiler line captures latent heat from flue gases, boosting thermal efficiency to 98.5% and reducing fuel consumption by up to 15%.

Waste Heat Recovery

Integrated economizer options recover up to 5% additional energy from exhaust gases, preheating feedwater before it enters the boiler.

Project Highlights

Real-world results from Burnham Boilers installations across North America.

Food Processing Boiler Replacement

A mid-size food processing facility in Ohio replaced three legacy 200 HP fire-tube boilers with Burnham condensing units rated at 98.5% thermal efficiency. Post-commissioning flue gas analysis confirmed a 12% reduction in natural gas consumption. Total project lead time: 16 weeks from order to startup.

Food & Beverage

Hospital Dual-Fuel Retrofit

A 350-bed regional hospital in Pennsylvania converted its single-fuel oil boiler plant to dual-fuel (natural gas primary, #2 oil backup) using Burnham retrofit kits. The project was completed in 5 days during a scheduled maintenance window, and the facility has maintained uninterrupted heating through two subsequent gas supply curtailments.

Healthcare

District Energy Low-NOx Upgrade

A municipal district heating network in Southern California replaced its burner assemblies across four 600 HP boilers with Burnham low-NOx units. Post-upgrade emissions testing showed NOx levels at 7.8 ppm, well below the SCAQMD Rule 1146 limit of 9 ppm. Annual regulatory compliance costs dropped as a result.

District Energy

Frequently Asked Questions

Our steam boiler range covers 15 HP to 800 HP (150 to 8,000 lbs/hr steam output), and our hot water boilers deliver from 400,000 BTU/hr to 12,000,000 BTU/hr. For larger capacities, we design multi-boiler plant configurations with lead-lag sequencing to match your load profile.

Yes. Every pressure vessel we manufacture carries the ASME U Stamp (unfired vessels) and S Stamp (power boilers). All electrical components are UL Listed, and our gas-fired products carry CSA certification. We also comply with NFPA 85 for boiler operation safety.

Standard models ship within 8 to 12 weeks. Custom-engineered systems, including multi-boiler plants and specialized burner packages, typically require 14 to 20 weeks depending on specifications. We maintain a stock of common components to accelerate delivery when project timelines are tight.

In most cases, yes. Our dual-fuel burner retrofit kits are designed for drop-in compatibility with major boiler OEMs. Our field team performs a combustion analysis, evaluates the existing firebox and controls, and provides a detailed conversion proposal. Typical retrofit projects are completed in 3 to 5 days with minimal downtime.

Yes. Our Thermal Assurance Program includes semi-annual inspections, combustion tuning, water chemistry analysis, safety valve testing, and 24/7 emergency call-out. Clients on this program experience 40% fewer unplanned shutdowns on average and qualify for extended warranty coverage.

Ready to Upgrade Your Heating System?

Our engineering team will evaluate your requirements and provide a detailed proposal within 48 hours. No obligation, no pressure — just straight answers from people who understand boilers.

  • ✓ Free on-site or remote consultation
  • ✓ Detailed ROI analysis for your facility
  • ✓ Custom engineering drawings included
  • ✓ Competitive financing options available